Wattly
Public EV chargerby Blink Charging

Across from Building 22

22 Oasis Way

AvailableUp to 4 kW · SlowType 1

Charger types at Across from Building 22

1 unit
Type 1J17724kWSlowStatus unknown1 connector

Run by Blink ChargingOperator website ↗

Questions about Across from Building 22

How fast is the EV charger at Across from Building 22?

Across from Building 22 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Across from Building 22 have?

Across from Building 22 has 1 connector: 1 × Type 1 (4kW).

Who runs the charger at Across from Building 22?

The charger at Across from Building 22 is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Across from Building 22?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
1 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact