Wattly
Public EV chargerby Enel X

ADS Limenella Nord

Autostrada A4 Brescia-Padova, KM 162

AvailableUp to 99 kW · RapidCCS

Charger types at ADS Limenella Nord

1 unit
CCSType 299kWRapidAvailable2 connectors

Run by Enel XOperator website ↗

Questions about ADS Limenella Nord

How fast is the EV charger at ADS Limenella Nord?

ADS Limenella Nord charges at up to 99kW, which counts as rapid charging in the UK.

What connectors does ADS Limenella Nord have?

ADS Limenella Nord has 2 connectors: 2 × CCS (99kW).

Who runs the charger at ADS Limenella Nord?

The charger at ADS Limenella Nord is run by Enel X. The operator's website has account and tariff details.

Can anyone use the charger at ADS Limenella Nord?

Open to the public, no membership required.

Price and access

Max power
99 kW
Rapid
Connectors
CCS
2 in total
Access
Public
Network
Enel X
Listed since
Oct 2016

Contact