Wattly
Public EV chargerby (Unknown Operator)

Ayuntamiento de Moriles

Calle García de Leániz

AvailableUp to 11 kW · FastType 2Free

Charger types at Ayuntamiento de Moriles

1 unit
Type 2Socket Only11kWFastAvailable2 connectors

Run by (Unknown Operator)

Questions about Ayuntamiento de Moriles

How fast is the EV charger at Ayuntamiento de Moriles?

Ayuntamiento de Moriles charges at up to 11kW, which counts as fast charging in the UK.

What connectors does Ayuntamiento de Moriles have?

Ayuntamiento de Moriles has 2 connectors: 2 × Type 2 (11kW).

How much does it cost to charge at Ayuntamiento de Moriles?

Charging at Ayuntamiento de Moriles is listed as free. Check on site, as tariffs and parking charges can change.

Who runs the charger at Ayuntamiento de Moriles?

The charger at Ayuntamiento de Moriles is run by (Unknown Operator).

Can anyone use the charger at Ayuntamiento de Moriles?

Open to the public, no membership required.

Price and access

Price
Free
Max power
11 kW
Fast
Connectors
Type 2
2 in total
Access
Public
Network
(Unknown Operator)
Listed since
Jul 2024