Wattly
Public EV chargerby Innogy SE (RWE eMobility)

Böhmestraße 19

Böhmestraße 19

AvailableUp to 11 kW · FastType 2

Charger types at Böhmestraße 19

2 units
Type 2Socket Only11kWFastStatus unknown1 connector
Type 2Socket Only11kWFastStatus unknown1 connector

Run by Innogy SE (RWE eMobility)

About Böhmestraße 19

The EV charger location at Böhmestraße 19 is open to the public, but a membership is required to use the chargers. The chargers available at this location are Type 2 (Socket Only) with a power output of 11 kWh. There are two chargers of this type available for use.

Questions about Böhmestraße 19

How fast is the EV charger at Böhmestraße 19?

Böhmestraße 19 charges at up to 11kW, which counts as fast charging in the UK.

What connectors does Böhmestraße 19 have?

Böhmestraße 19 has 2 connectors: 2 × Type 2 (11kW).

Who runs the charger at Böhmestraße 19?

The charger at Böhmestraße 19 is run by Innogy SE (RWE eMobility).

Can anyone use the charger at Böhmestraße 19?

Public, but a membership or subscription is required.

Price and access

Max power
11 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
Innogy SE (RWE eMobility)
Listed since
Jan 2015