Bau und Umweltamt
Holbeinplatz 14
Charger types at Bau und Umweltamt
1 unitRun by Stadtwerke Rostock
About Bau und Umweltamt
The Bau und Umweltamt Holbeinplatz 14 is a public location that offers electric vehicle charging services. This location is conveniently situated at Holbeinplatz 14, making it easily accessible for EV users. The charging station is managed by the local government and is equipped with Type 2 (Socket Only) chargers with a power output of 22 kWh.
The Type 2 chargers at this location are suitable for most electric vehicles and provide a quick and efficient charging experience. The charging station is open to the public and does not require any membership or subscription. EV users can simply plug in their vehicles and start charging. The Bau und Umweltamt Holbeinplatz 14 is committed to promoting sustainable transportation options and providing convenient charging solutions for EV owners.
This EV charger location is a great option for those looking to charge their electric vehicles while on the go. The Type 2 chargers offer a high power output of 22 kWh, allowing for a quick and efficient charging experience. Located at Holbeinplatz 14, this charging station is easily accessible and does not require any membership or subscription. The Bau und Umweltamt Holbeinplatz 14 is dedicated to promoting environmentally friendly transportation options and providing convenient charging solutions for EV owners.
Questions about Bau und Umweltamt
How fast is the EV charger at Bau und Umweltamt?
Bau und Umweltamt charges at up to 22kW, which counts as fast charging in the UK.
What connectors does Bau und Umweltamt have?
Bau und Umweltamt has 2 connectors: 2 × Type 2 (22kW).
How much does it cost to charge at Bau und Umweltamt?
The listed price at Bau und Umweltamt is 99p per kWh. Note: € + 0.39 € per kWh. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Bau und Umweltamt?
The charger at Bau und Umweltamt is run by Stadtwerke Rostock.
Can anyone use the charger at Bau und Umweltamt?
Open to the public, no membership required.
Price and access
- Price
- 99p/kWh
- € + 0.39 € per kWh
- Max power
- 22 kW
- Fast
- Connectors
- Type 2
- 2 in total
- Access
- Public
- Network
- Stadtwerke Rostock
- Listed since
- Apr 2017
Within 2 miles