Wattly
Public EV chargerby Be Charge (Italy)

Be Charge Mirandola Maestri del Lavoro

Via Maestri del Lavoro 4

AvailableUp to 22 kW · FastType 2

Charger types at Be Charge Mirandola Maestri del Lavoro

1 unit
Type 2Socket Only22kWFastAvailable2 connectors

Run by Be Charge (Italy)Operator website ↗

Questions about Be Charge Mirandola Maestri del Lavoro

How fast is the EV charger at Be Charge Mirandola Maestri del Lavoro?

Be Charge Mirandola Maestri del Lavoro charges at up to 22kW, which counts as fast charging in the UK.

What connectors does Be Charge Mirandola Maestri del Lavoro have?

Be Charge Mirandola Maestri del Lavoro has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at Be Charge Mirandola Maestri del Lavoro?

The charger at Be Charge Mirandola Maestri del Lavoro is run by Be Charge (Italy). The operator's website has account and tariff details.

Can anyone use the charger at Be Charge Mirandola Maestri del Lavoro?

Public, but a membership or subscription is required.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
Be Charge (Italy)
Listed since
Dec 2019

Contact