Wattly
Public EV chargerby ChargePoint

BERNALILLO CO. ALVARADO SQUARE

402 Silver Ave SW

AvailableUp to 4 kW · SlowType 1

Charger types at BERNALILLO CO. ALVARADO SQUARE

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about BERNALILLO CO. ALVARADO SQUARE

How fast is the EV charger at BERNALILLO CO. ALVARADO SQUARE?

BERNALILLO CO. ALVARADO SQUARE charges at up to 4kW, which counts as slow charging in the UK.

What connectors does BERNALILLO CO. ALVARADO SQUARE have?

BERNALILLO CO. ALVARADO SQUARE has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at BERNALILLO CO. ALVARADO SQUARE?

The charger at BERNALILLO CO. ALVARADO SQUARE is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at BERNALILLO CO. ALVARADO SQUARE?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Mar 2023

Contact