Wattly
Public EV chargerby Fenie Energía (Spain)

Boadilla del Monte - Hermanos Machado

Calle Hermanos Machado, 1503

AvailableUp to 22 kW · FastType 20p/kWh

Charger types at Boadilla del Monte - Hermanos Machado

2 units
Type 2Socket Only22kWFastAvailable3 connectors
OtherCEE 7/4 - Schuko - Type F2kWSlowAvailable3 connectors

Run by Fenie Energía (Spain)

Questions about Boadilla del Monte - Hermanos Machado

How fast is the EV charger at Boadilla del Monte - Hermanos Machado?

Boadilla del Monte - Hermanos Machado charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 2kW to 22kW.

What connectors does Boadilla del Monte - Hermanos Machado have?

Boadilla del Monte - Hermanos Machado has 6 connectors: 3 × Type 2 (22kW) and 3 × Other (2kW).

How much does it cost to charge at Boadilla del Monte - Hermanos Machado?

The listed price at Boadilla del Monte - Hermanos Machado is 0p per kWh. Note: €. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Boadilla del Monte - Hermanos Machado?

The charger at Boadilla del Monte - Hermanos Machado is run by Fenie Energía (Spain).

Can anyone use the charger at Boadilla del Monte - Hermanos Machado?

Public, but a membership or subscription is required.

Price and access

Price
0p/kWh
€
Max power
22 kW
Fast
Connectors
Type 2
6 in total
Access
Members
Network
Fenie Energía (Spain)
Listed since
Feb 2016

Contact