Brunel Street Car Park Birmingham
Brunel Street
Charger types at Brunel Street Car Park Birmingham
8 unitsRun by ESB Energy (UK)Operator website ↗
About Brunel Street Car Park Birmingham
Located at Brunel Street Car Park in Birmingham, this EV charger location offers public access with pay-at-location options. The chargers available at this site include two Type 2 (Socket Only) chargers with a power output of 22 kWh each, as well as a CCS (Type 2) charger with a power output of 50 kWh. These chargers are suitable for electric vehicles that are compatible with Type 2 and CCS charging standards.
EV drivers visiting Brunel Street Car Park can conveniently access the charging facilities provided at this location. With multiple chargers available, users can choose the charger that best suits their vehicle's charging requirements. The pay-at-location option makes it easy for drivers to charge their EVs without the need for a subscription or membership, offering a hassle-free charging experience for all users.
As a public charging location, Brunel Street Car Park in Birmingham provides a convenient option for EV drivers in need of a quick recharge. The Type 2 and CCS chargers available at this site offer varying power outputs to accommodate different types of electric vehicles. With pay-at-location options, users can easily access and pay for charging services as needed, making this EV charger location a practical choice for EV owners in the area.
Questions about Brunel Street Car Park Birmingham
How fast is the EV charger at Brunel Street Car Park Birmingham?
Brunel Street Car Park Birmingham charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 22kW to 50kW.
What connectors does Brunel Street Car Park Birmingham have?
Brunel Street Car Park Birmingham has 8 connectors: 2 × CCS (50kW), 2 × CHAdeMO (44kW) and 4 × Type 2 (22kW).
Who runs the charger at Brunel Street Car Park Birmingham?
The charger at Brunel Street Car Park Birmingham is run by ESB Energy (UK). The operator's website has account and tariff details.
Can anyone use the charger at Brunel Street Car Park Birmingham?
Open to the public, pay at the charger.
Price and access
- Max power
- 50 kW
- Rapid
- Connectors
- CCS, CHAdeMO, Type 2
- 8 in total
- Access
- Pay at location
- Network
- ESB Energy (UK)
- Listed since
- Dec 2019
Contact
Within 2 miles