Wattly
Public EV chargerby Blink Charging

Bryant Venture Phase 1-A&C,LLC

Master Association 680 Rhode Island Ave NE

AvailableUp to 4 kW · SlowType 1

Charger types at Bryant Venture Phase 1-A&C,LLC

1 unit
Type 1J17724kWSlowStatus unknown1 connector

Run by Blink ChargingOperator website ↗

Questions about Bryant Venture Phase 1-A&C,LLC

How fast is the EV charger at Bryant Venture Phase 1-A&C,LLC?

Bryant Venture Phase 1-A&C,LLC charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Bryant Venture Phase 1-A&C,LLC have?

Bryant Venture Phase 1-A&C,LLC has 1 connector: 1 × Type 1 (4kW).

Who runs the charger at Bryant Venture Phase 1-A&C,LLC?

The charger at Bryant Venture Phase 1-A&C,LLC is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Bryant Venture Phase 1-A&C,LLC?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
1 in total
Access
Public
Network
Blink Charging
Listed since
Mar 2023

Contact