Wattly
Public EV chargerby Charge Your Car

Buckinghamshire Council Offices

The Gateway

AvailableUp to 50 kW · RapidCHAdeMO, CCS£8.00/session

Charger types at Buckinghamshire Council Offices

3 units
CHAdeMO50kWRapidAvailable3 connectors
OtherType 2 (Tethered Connector)43kWRapidAvailable3 connectors
CCSType 250kWRapidAvailable3 connectors

Run by Charge Your Car

About Buckinghamshire Council Offices

Located at the Buckinghamshire Council Offices, The Gateway, this EV charger station is open to the public but requires a membership for access. The station offers a variety of charging options including a CHAdeMO charger with a power output of 50 kWh, a Type 2 charger with a tethered connector and a power output of 43 kWh, and a CCS (Type 2) charger with a power output of 50 kWh. These charging options cater to a wide range of electric vehicles, making it a convenient stop for EV owners in the area.

Questions about Buckinghamshire Council Offices

How fast is the EV charger at Buckinghamshire Council Offices?

Buckinghamshire Council Offices charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.

What connectors does Buckinghamshire Council Offices have?

Buckinghamshire Council Offices has 9 connectors: 3 × CHAdeMO (50kW), 3 × CCS (50kW) and 3 × Other (43kW).

How much does it cost to charge at Buckinghamshire Council Offices?

The listed price at Buckinghamshire Council Offices is £8.00 per session. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Buckinghamshire Council Offices?

The charger at Buckinghamshire Council Offices is run by Charge Your Car.

Can anyone use the charger at Buckinghamshire Council Offices?

Public, but a membership or subscription is required.

Price and access

Price
£8.00/session
Max power
50 kW
Rapid
Connectors
CHAdeMO, CCS
9 in total
Access
Members
Network
Charge Your Car
Listed since
Jun 2015