Wattly
Public EV chargerby Blink Charging

Building 4000

100 Flint Pond Circle

AvailableUp to 4 kW · SlowType 1

Charger types at Building 4000

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by Blink ChargingOperator website ↗

Questions about Building 4000

How fast is the EV charger at Building 4000?

Building 4000 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Building 4000 have?

Building 4000 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at Building 4000?

The charger at Building 4000 is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at Building 4000?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
Blink Charging
Listed since
Sept 2023

Contact