Public EV chargerby (Unknown Operator)
Centro de Interpretación del Urogallo
Caboalles de Arriba
Charger types at Centro de Interpretación del Urogallo
2 unitsRun by (Unknown Operator)
Questions about Centro de Interpretación del Urogallo
How fast is the EV charger at Centro de Interpretación del Urogallo?
Centro de Interpretación del Urogallo charges at up to 7kW, which counts as fast charging in the UK. Its connectors range from 4kW to 7kW.
What connectors does Centro de Interpretación del Urogallo have?
Centro de Interpretación del Urogallo has 2 connectors: 1 × Type 2 (7kW) and 1 × Other (4kW).
Who runs the charger at Centro de Interpretación del Urogallo?
The charger at Centro de Interpretación del Urogallo is run by (Unknown Operator).
Can anyone use the charger at Centro de Interpretación del Urogallo?
Open to the public, no membership required.
Price and access
- Max power
- 7 kW
- Fast
- Connectors
- Type 2
- 2 in total
- Access
- Public
- Network
- (Unknown Operator)
- Listed since
- Jul 2024