Wattly
Public EV chargerby ChargePoint

CITY OF MALDEN JACKSON GAR 4

7 Jackson Street Jackson Street Garage

AvailableUp to 4 kW · SlowType 1

Charger types at CITY OF MALDEN JACKSON GAR 4

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about CITY OF MALDEN JACKSON GAR 4

How fast is the EV charger at CITY OF MALDEN JACKSON GAR 4?

CITY OF MALDEN JACKSON GAR 4 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does CITY OF MALDEN JACKSON GAR 4 have?

CITY OF MALDEN JACKSON GAR 4 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at CITY OF MALDEN JACKSON GAR 4?

The charger at CITY OF MALDEN JACKSON GAR 4 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at CITY OF MALDEN JACKSON GAR 4?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2023

Contact