Wattly
Public EV chargerby ChargePoint

CITY_OF_VERNON 3805 SOTO-1

3805 S Soto St

AvailableUp to 125 kW · Ultra-rapidCCS, CHAdeMO

Charger types at CITY_OF_VERNON 3805 SOTO-1

2 units
CHAdeMO63kWRapidStatus unknown1 connector
CCSType 1125kWUltra-rapidStatus unknown1 connector

Run by ChargePointOperator website ↗

Questions about CITY_OF_VERNON 3805 SOTO-1

How fast is the EV charger at CITY_OF_VERNON 3805 SOTO-1?

CITY_OF_VERNON 3805 SOTO-1 charges at up to 125kW, which counts as ultra-rapid charging in the UK. Its connectors range from 63kW to 125kW.

What connectors does CITY_OF_VERNON 3805 SOTO-1 have?

CITY_OF_VERNON 3805 SOTO-1 has 2 connectors: 1 × CCS (125kW) and 1 × CHAdeMO (63kW).

Who runs the charger at CITY_OF_VERNON 3805 SOTO-1?

The charger at CITY_OF_VERNON 3805 SOTO-1 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at CITY_OF_VERNON 3805 SOTO-1?

Open to the public, no membership required.

Price and access

Max power
125 kW
Ultra-rapid
Connectors
CCS, CHAdeMO
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2024

Contact