Wattly
Public EV chargerby Blink Charging

City U Project

125 W Central

AvailableUp to 4 kW · SlowType 1

Charger types at City U Project

1 unit
Type 1J17724kWSlowStatus unknown6 connectors

Run by Blink ChargingOperator website ↗

Questions about City U Project

How fast is the EV charger at City U Project?

City U Project charges at up to 4kW, which counts as slow charging in the UK.

What connectors does City U Project have?

City U Project has 6 connectors: 6 × Type 1 (4kW).

Who runs the charger at City U Project?

The charger at City U Project is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at City U Project?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
6 in total
Access
Public
Network
Blink Charging
Listed since
May 2023

Contact