Wattly
Public EV chargerby TotalEnergies (ES)

Cooperativa De Meirás San Mateo

Campo Ratas Trasancos

AvailableUp to 150 kW · Ultra-rapidCCS, CHAdeMO, Type 250p/kWh

Charger types at Cooperativa De Meirás San Mateo

3 units
CCSType 2150kWUltra-rapidAvailable2 connectors
CHAdeMO50kWRapidAvailable1 connector
Type 2Socket Only22kWFastAvailable1 connector

Run by TotalEnergies (ES)

Questions about Cooperativa De Meirás San Mateo

How fast is the EV charger at Cooperativa De Meirás San Mateo?

Cooperativa De Meirás San Mateo charges at up to 150kW, which counts as ultra-rapid charging in the UK. Its connectors range from 22kW to 150kW.

What connectors does Cooperativa De Meirás San Mateo have?

Cooperativa De Meirás San Mateo has 4 connectors: 2 × CCS (150kW), 1 × CHAdeMO (50kW) and 1 × Type 2 (22kW).

How much does it cost to charge at Cooperativa De Meirás San Mateo?

The listed price at Cooperativa De Meirás San Mateo is 50p per kWh. Note: €/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at Cooperativa De Meirás San Mateo?

The charger at Cooperativa De Meirás San Mateo is run by TotalEnergies (ES).

Can anyone use the charger at Cooperativa De Meirás San Mateo?

Public, but a membership or subscription is required.

Price and access

Price
50p/kWh
€/kWh >60kW - 0,39€/kWh DC - 0,32€/kWh AC
Max power
150 kW
Ultra-rapid
Connectors
CCS, CHAdeMO, Type 2
4 in total
Access
Members
Network
TotalEnergies (ES)
Listed since
Aug 2022