Make money by listing your private Home or Business EV charger with Wattly! Let other drivers charge their electric vehicles at your home or business, and start earning today.
Earn passive income while helping the EV community grow
Track your earnings, monitor usage, and manage sessions with ease
Join a growing network of EV charger hosts, contributing to a greener future
Attract eco-conscious drivers looking for convenient, local charging stations
Help reduce the strain on public charging infrastructure by offering your own charger
Set your own availability and pricing to maximize your earnings
Wattly provides secure payments and protects your privacy with simple management tools
Cross Lanes Organic Farm, located in Cross Lanes, is a public charging location for electric vehicles. However, membership is required to access the charging stations. The chargers available at this location are Type 2, which only have a socket for charging, and have a capacity of 7 kWh.
This EV charging location is situated in a picturesque setting, surrounded by the lush green fields of Cross Lanes Organic Farm. The farm is committed to promoting sustainable practices and providing a convenient option for electric vehicle owners to charge their cars while supporting local agriculture. The charging stations are easily accessible and located near the farm's main entrance.
Electric vehicle owners can make use of the Type 2 chargers at Cross Lanes Organic Farm to power up their vehicles while enjoying the farm's organic produce and scenic views. The 7 kWh capacity of the chargers allows for a quick and efficient charging experience. With a membership, drivers can easily access this charging location and contribute to the farm's mission of promoting sustainable living.
Type 2 Mennekes 7kW charging post in the car park of Cross Lanes Organic Farm. Operated by Alfa Power. Contactless, App or RFID. www.alfapower.co.uk/app
*This information may not be up to date. Please check with operator.
The data for this location has been provided by UK National Charge Point Registry Contains public sector information licensed under the Open Government Licence v2.0.
Our network is growing, but not all chargers are currently integrated with Wattly. We work directly with operators to bring you the best charging experience, but some chargers may require you to use the operator's own booking system. We're continually working to bring more chargers into our network, so please check back soon!
How long would you like to charge?
When do you want to charge?
What time would you like?
Booking Summary:
Date:
Duration:
Time:
Charger Capacity:
Energy Supplied:
Current Charge:
Estimated Battery After Charge:
Estimate Time to Fully Charge:
Estimated Subtotal:
Additional Parking fee: *
Our Fees:
VAT:
Estimated Total:
Disclaimer: Please note that the figures provided above are estimates. The final costs will be calculated based on the actual time required to fully charge your vehicle. These estimates may vary depending on several factors, including the current quality and condition of your vehicle's battery and the performance efficiency of the selected charger.
*Additionally, parking charges will apply once your vehicle has completed its charging session. Parking is free up until the nearest whole hour after your charging session ends. After that, a fixed parking fee per hour will be applied while your vehicle remains parked and not charging.