Wattly
Public EV chargerby eVgo Network

Deering Oak Park

State St

AvailableUp to 4 kW · SlowType 1

Charger types at Deering Oak Park

1 unit
Type 1J17724kWSlowStatus unknown6 connectors

Run by eVgo NetworkOperator website ↗

Questions about Deering Oak Park

How fast is the EV charger at Deering Oak Park?

Deering Oak Park charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Deering Oak Park have?

Deering Oak Park has 6 connectors: 6 × Type 1 (4kW).

Who runs the charger at Deering Oak Park?

The charger at Deering Oak Park is run by eVgo Network. The operator's website has account and tariff details.

Can anyone use the charger at Deering Oak Park?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
6 in total
Access
Public
Network
eVgo Network
Listed since
May 2023

Contact