Public EV chargerby ChargePoint
DEPT OF ECOLOGY HQ 3
300 Desmond Dr SE
Charger types at DEPT OF ECOLOGY HQ 3
1 unitRun by ChargePointOperator website ↗
Questions about DEPT OF ECOLOGY HQ 3
How fast is the EV charger at DEPT OF ECOLOGY HQ 3?
DEPT OF ECOLOGY HQ 3 charges at up to 4kW, which counts as slow charging in the UK.
What connectors does DEPT OF ECOLOGY HQ 3 have?
DEPT OF ECOLOGY HQ 3 has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at DEPT OF ECOLOGY HQ 3?
The charger at DEPT OF ECOLOGY HQ 3 is run by ChargePoint. The operator's website has account and tariff details.
Can anyone use the charger at DEPT OF ECOLOGY HQ 3?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Public
- Network
- ChargePoint
- Listed since
- Mar 2023
Contact
- Phone
- 888-758-4389
- Website
- www.chargepoint.com
Within 2 miles