Wattly
Public EV chargerby Innogy SE (RWE eMobility)

E-Bike Station Aus- und Weiterbildungszentrum Rau

Rauschermühle

AvailableUp to 2 kW · Slow

Charger types at E-Bike Station Aus- und Weiterbildungszentrum Rau

1 unit
OtherCEE 7/4 - Schuko - Type F2kWSlowAvailable3 connectors

Run by Innogy SE (RWE eMobility)Operator website ↗

About E-Bike Station Aus- und Weiterbildungszentrum Rau

The E-Bike Station at the Aus- und Weiterbildungszentrum Rau Rauschermühle offers public chargers for electric vehicles. These chargers are compatible with CEE 7/4, Schuko, and Type F outlets, and have a capacity of 2 kWh. Located at the Rau Rauschermühle, this charging station is easily accessible for those in need of a quick charge for their electric bikes or other vehicles.

Questions about E-Bike Station Aus- und Weiterbildungszentrum Rau

How fast is the EV charger at E-Bike Station Aus- und Weiterbildungszentrum Rau?

E-Bike Station Aus- und Weiterbildungszentrum Rau charges at up to 2kW, which counts as slow charging in the UK.

Who runs the charger at E-Bike Station Aus- und Weiterbildungszentrum Rau?

The charger at E-Bike Station Aus- und Weiterbildungszentrum Rau is run by Innogy SE (RWE eMobility). The operator's website has account and tariff details.

Can anyone use the charger at E-Bike Station Aus- und Weiterbildungszentrum Rau?

Open to the public, no membership required.

Price and access

Max power
2 kW
Slow
Access
Public
Network
Innogy SE (RWE eMobility)
Listed since
Aug 2015

Contact