Wattly
Public EV chargerby Innogy SE (RWE eMobility)

E-Bike Station Verbandsgemeinde-Verwaltung

Hospitalstraße 22

AvailableUp to 2 kW · Slow

Charger types at E-Bike Station Verbandsgemeinde-Verwaltung

1 unit
OtherCEE 7/4 - Schuko - Type F2kWSlowAvailable3 connectors

Run by Innogy SE (RWE eMobility)Operator website ↗

About E-Bike Station Verbandsgemeinde-Verwaltung

The E-Bike Station at Verbandsgemeinde-Verwaltung Hospitalstraße 22 is a convenient location for charging your electric bike. This charging station is located at the administrative building for the Verbandsgemeinde, or collective municipality, and is easily accessible for visitors and locals alike.

Questions about E-Bike Station Verbandsgemeinde-Verwaltung

How fast is the EV charger at E-Bike Station Verbandsgemeinde-Verwaltung?

E-Bike Station Verbandsgemeinde-Verwaltung charges at up to 2kW, which counts as slow charging in the UK.

Who runs the charger at E-Bike Station Verbandsgemeinde-Verwaltung?

The charger at E-Bike Station Verbandsgemeinde-Verwaltung is run by Innogy SE (RWE eMobility). The operator's website has account and tariff details.

Can anyone use the charger at E-Bike Station Verbandsgemeinde-Verwaltung?

Open to the public, no membership required.

Price and access

Max power
2 kW
Slow
Access
Public
Network
Innogy SE (RWE eMobility)
Listed since
Aug 2015

Contact