Wattly
Public EV chargerby TotalEnergies (ES)

E.S. Palacios de Goda

Autovia del Noroeste 135

AvailableUp to 220 kW · Ultra-rapidCCS, CHAdeMO0p

Charger types at E.S. Palacios de Goda

4 units
CCSType 2220kWUltra-rapidAvailable2 connectors
CCSType 250kWRapidAvailable1 connector
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector

Run by TotalEnergies (ES)Operator website ↗

Questions about E.S. Palacios de Goda

How fast is the EV charger at E.S. Palacios de Goda?

E.S. Palacios de Goda charges at up to 220kW, which counts as ultra-rapid charging in the UK. Its connectors range from 43kW to 220kW.

What connectors does E.S. Palacios de Goda have?

E.S. Palacios de Goda has 5 connectors: 3 × CCS (up to 220kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).

How much does it cost to charge at E.S. Palacios de Goda?

The listed price at E.S. Palacios de Goda is 0p. Note: 65€/kWh 200kW - 0,39€/kWh 50 kW - 0,32€/kWh AC. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at E.S. Palacios de Goda?

The charger at E.S. Palacios de Goda is run by TotalEnergies (ES). The operator's website has account and tariff details.

Can anyone use the charger at E.S. Palacios de Goda?

Public, but a membership or subscription is required.

Price and access

Price
0p
65€/kWh 200kW - 0,39€/kWh 50 kW - 0,32€/kWh AC
Max power
220 kW
Ultra-rapid
Connectors
CCS, CHAdeMO
5 in total
Access
Members
Network
TotalEnergies (ES)
Listed since
Nov 2020

Contact

Website
wenea.com