Wattly
Public EV chargerby Blink Charging

East Campus Building

301 Grove Street

AvailableUp to 4 kW · SlowType 1

Charger types at East Campus Building

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by Blink ChargingOperator website ↗

Questions about East Campus Building

How fast is the EV charger at East Campus Building?

East Campus Building charges at up to 4kW, which counts as slow charging in the UK.

What connectors does East Campus Building have?

East Campus Building has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at East Campus Building?

The charger at East Campus Building is run by Blink Charging. The operator's website has account and tariff details.

Can anyone use the charger at East Campus Building?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
Blink Charging
Listed since
Feb 2023

Contact