Wattly
Public EV chargerby ChargePoint

ERLAB STATIONS ERLAB STATION 2

388 Newburyport Turnpike

AvailableUp to 4 kW · SlowType 1

Charger types at ERLAB STATIONS ERLAB STATION 2

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about ERLAB STATIONS ERLAB STATION 2

How fast is the EV charger at ERLAB STATIONS ERLAB STATION 2?

ERLAB STATIONS ERLAB STATION 2 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does ERLAB STATIONS ERLAB STATION 2 have?

ERLAB STATIONS ERLAB STATION 2 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at ERLAB STATIONS ERLAB STATION 2?

The charger at ERLAB STATIONS ERLAB STATION 2 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at ERLAB STATIONS ERLAB STATION 2?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2023

Contact