FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro
N109 Ferrugenta - Tavarede, Est. Aveiro
Charger types at FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro
2 unitsRun by GALP Electric
About FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro
The EV charger location with the reference number FIG-00019 is situated in N109 Ferrugenta - Tavarede, Est. Aveiro. This location is equipped with two types of chargers, namely CHAdeMO 60 kWh and CCS (Type 2) 120 kWh. These chargers provide fast and efficient charging for electric vehicles.
The N109 Ferrugenta - Tavarede, Est. Aveiro EV charger location is conveniently located along the main road, making it easily accessible for EV drivers. The CHAdeMO 60 kWh charger is suitable for smaller electric vehicles, while the CCS (Type 2) 120 kWh charger is designed for larger vehicles. This location is ideal for a quick pit stop to recharge your electric vehicle while on the road.
Both chargers at this location are equipped with the latest technology to ensure safe and reliable charging for your electric vehicle. The CHAdeMO 60 kWh charger is capable of providing 80% charge in just 30 minutes, while the CCS (Type 2) 120 kWh charger can deliver a full charge in approximately one hour. This EV charger location is a convenient and efficient option for electric vehicle owners in the N109 Ferrugenta - Tavarede area.
Questions about FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro
How fast is the EV charger at FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro?
FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro charges at up to 120kW, which counts as ultra-rapid charging in the UK. Its connectors range from 60kW to 120kW.
What connectors does FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro have?
FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro has 2 connectors: 1 × CCS (120kW) and 1 × CHAdeMO (60kW).
Who runs the charger at FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro?
The charger at FIG-00019 N109 Ferrugenta - Tavarede, Est. Aveiro is run by GALP Electric.
Price and access
- Max power
- 120 kW
- Ultra-rapid
- Connectors
- CCS, CHAdeMO
- 2 in total
- Network
- GALP Electric
- Listed since
- Mar 2023
Within 2 miles