Wattly
Public EV charger

Framingham State University Facilities Building Lot

23 Salem End Rd

AvailableUp to 4 kW · SlowType 1

Charger types at Framingham State University Facilities Building Lot

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Questions about Framingham State University Facilities Building Lot

How fast is the EV charger at Framingham State University Facilities Building Lot?

Framingham State University Facilities Building Lot charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Framingham State University Facilities Building Lot have?

Framingham State University Facilities Building Lot has 2 connectors: 2 × Type 1 (4kW).

Can anyone use the charger at Framingham State University Facilities Building Lot?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Listed since
Feb 2024