Wattly
Public EV chargerby ChargePoint

GA CYBER CENTER STATION 3

100 Grace Hopper Ln

AvailableUp to 4 kW · SlowType 1

Charger types at GA CYBER CENTER STATION 3

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about GA CYBER CENTER STATION 3

How fast is the EV charger at GA CYBER CENTER STATION 3?

GA CYBER CENTER STATION 3 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does GA CYBER CENTER STATION 3 have?

GA CYBER CENTER STATION 3 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at GA CYBER CENTER STATION 3?

The charger at GA CYBER CENTER STATION 3 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at GA CYBER CENTER STATION 3?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2024

Contact