Wattly
Public EV chargerby Stromnetz Hamburg

Gemeindeverwaltung

Am Park 2

AvailableUp to 22 kW · FastType 2

Charger types at Gemeindeverwaltung

1 unit
Type 2Socket Only22kWFastAvailable2 connectors

Run by Stromnetz HamburgOperator website ↗

About Gemeindeverwaltung

The Gemeindeverwaltung Am Park 2 is a public building located in a park setting. It is open to the general public, but membership is required to access the EV chargers on the premises. These chargers are specifically designed for Type 2 vehicles and can provide up to 22 kWh of charging power.

Questions about Gemeindeverwaltung

How fast is the EV charger at Gemeindeverwaltung?

Gemeindeverwaltung charges at up to 22kW, which counts as fast charging in the UK.

What connectors does Gemeindeverwaltung have?

Gemeindeverwaltung has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at Gemeindeverwaltung?

The charger at Gemeindeverwaltung is run by Stromnetz Hamburg. The operator's website has account and tariff details.

Can anyone use the charger at Gemeindeverwaltung?

Public, but a membership or subscription is required.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
Stromnetz Hamburg
Listed since
Jun 2018

Contact