Wattly
Public EV chargerby E-Wald

Gemeindeverwaltung

Ziegenhainer Straße 2

AvailableUp to 22 kW · FastType 2

Charger types at Gemeindeverwaltung

1 unit
Type 2Socket Only22kWFastAvailable2 connectors

Run by E-Wald

About Gemeindeverwaltung

The Gemeindeverwaltung Ziegenhainer Straße 2 is a public location that offers EV charging services. It is located on Ziegenhainer Straße 2 and can be easily accessed by members of the community. However, please note that membership is required in order to use the chargers provided at this location.

Questions about Gemeindeverwaltung

How fast is the EV charger at Gemeindeverwaltung?

Gemeindeverwaltung charges at up to 22kW, which counts as fast charging in the UK.

What connectors does Gemeindeverwaltung have?

Gemeindeverwaltung has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at Gemeindeverwaltung?

The charger at Gemeindeverwaltung is run by E-Wald.

Can anyone use the charger at Gemeindeverwaltung?

Public, but a membership or subscription is required.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Members
Network
E-Wald
Listed since
Mar 2017