Wattly
Public EV chargerby RheinEnergie AG

Gemeindeverwaltung

Karlheinz-Stockhausen-Platz 1

AvailableUp to 22 kW · FastType 2

Charger types at Gemeindeverwaltung

2 units
Type 2Socket Only22kWFastAvailable2 connectors
OtherCEE 7/4 - Schuko - Type F3kWSlowAvailable2 connectors

Run by RheinEnergie AGOperator website ↗

About Gemeindeverwaltung

The EV charger location at Gemeindeverwaltung Karlheinz-Stockhausen-Platz 1 is a public charging station that requires membership for use. The chargers available at this location are Type 2 (Socket Only) with a charging capacity of 22 kWh, as well as CEE 7/4 - Schuko - Type F with a charging capacity of 3 kWh. This location is ideal for individuals who are members and need to charge their electric vehicles while in the area.

Questions about Gemeindeverwaltung

How fast is the EV charger at Gemeindeverwaltung?

Gemeindeverwaltung charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 3kW to 22kW.

What connectors does Gemeindeverwaltung have?

Gemeindeverwaltung has 4 connectors: 2 × Type 2 (22kW) and 2 × Other (3kW).

Who runs the charger at Gemeindeverwaltung?

The charger at Gemeindeverwaltung is run by RheinEnergie AG. The operator's website has account and tariff details.

Can anyone use the charger at Gemeindeverwaltung?

Public, but a membership or subscription is required.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
4 in total
Access
Members
Network
RheinEnergie AG
Listed since
Feb 2015

Contact