Wattly
Public EV chargerby (Unknown Operator)

HAS.TO.BE Hauptstraße 203d ‌Sillian

Hauptstraße 203d ‌Sillian

AvailableUp to 150 kW · Ultra-rapidCCS, CHAdeMO, Type 2

Charger types at HAS.TO.BE Hauptstraße 203d ‌Sillian

3 units
CCSType 2150kWUltra-rapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector
Type 2Socket Only22kWFastAvailable1 connector

Run by (Unknown Operator)Operator website ↗

Questions about HAS.TO.BE Hauptstraße 203d ‌Sillian

How fast is the EV charger at HAS.TO.BE Hauptstraße 203d ‌Sillian?

HAS.TO.BE Hauptstraße 203d ‌Sillian charges at up to 150kW, which counts as ultra-rapid charging in the UK. Its connectors range from 22kW to 150kW.

What connectors does HAS.TO.BE Hauptstraße 203d ‌Sillian have?

HAS.TO.BE Hauptstraße 203d ‌Sillian has 3 connectors: 1 × CCS (150kW), 1 × CHAdeMO (50kW) and 1 × Type 2 (22kW).

Who runs the charger at HAS.TO.BE Hauptstraße 203d ‌Sillian?

The charger at HAS.TO.BE Hauptstraße 203d ‌Sillian is run by (Unknown Operator). The operator's website has account and tariff details.

Can anyone use the charger at HAS.TO.BE Hauptstraße 203d ‌Sillian?

Public, but a membership or subscription is required.

Price and access

Max power
150 kW
Ultra-rapid
Connectors
CCS, CHAdeMO, Type 2
3 in total
Access
Members
Network
(Unknown Operator)
Listed since
Aug 2022

Contact