Wattly
Public EV chargerby ladenetz.de

Hauptstraße 75

Hauptstraße 75

UnknownUp to 22 kW · FastType 2

Charger types at Hauptstraße 75

2 units
Type 2Socket Only22kWFastAvailable1 connector
Type 2Socket Only22kWFastAvailable1 connector

Run by ladenetz.de

About Hauptstraße 75

Hauptstraße 75 is a convenient location for electric vehicle owners looking for a place to charge their vehicles. This location offers two Type 2 (Socket Only) chargers, each with a capacity of 22 kWh. Whether you are running errands or on a road trip, Hauptstraße 75 has you covered with these charging options.

Questions about Hauptstraße 75

How fast is the EV charger at Hauptstraße 75?

Hauptstraße 75 charges at up to 22kW, which counts as fast charging in the UK.

What connectors does Hauptstraße 75 have?

Hauptstraße 75 has 2 connectors: 2 × Type 2 (22kW).

Who runs the charger at Hauptstraße 75?

The charger at Hauptstraße 75 is run by ladenetz.de.

Price and access

Max power
22 kW
Fast
Connectors
Type 2
2 in total
Network
ladenetz.de
Listed since
Jul 2021