Wattly
Public EV chargerby Innogy SE (RWE eMobility)

Heinrich-Barth-Straße 29

Heinrich-Barth-Straße 29

AvailableUp to 11 kW · FastType 2

Charger types at Heinrich-Barth-Straße 29

1 unit
Type 2Socket Only11kWFastStatus unknown1 connector

Run by Innogy SE (RWE eMobility)

About Heinrich-Barth-Straße 29

Heinrich-Barth-Straße 29 is a location that offers EV charging services. It is located on Heinrich-Barth-Straße 29 and is open to the public, but membership is required to use the chargers.

Questions about Heinrich-Barth-Straße 29

How fast is the EV charger at Heinrich-Barth-Straße 29?

Heinrich-Barth-Straße 29 charges at up to 11kW, which counts as fast charging in the UK.

What connectors does Heinrich-Barth-Straße 29 have?

Heinrich-Barth-Straße 29 has 1 connector: 1 × Type 2 (11kW).

Who runs the charger at Heinrich-Barth-Straße 29?

The charger at Heinrich-Barth-Straße 29 is run by Innogy SE (RWE eMobility).

Can anyone use the charger at Heinrich-Barth-Straße 29?

Public, but a membership or subscription is required.

Price and access

Max power
11 kW
Fast
Connectors
Type 2
1 in total
Access
Members
Network
Innogy SE (RWE eMobility)
Listed since
Jan 2015