Public EV chargerby ChargePoint
HIGH ASSOCIATES BUILDING 153
1861 Charter Ln
Charger types at HIGH ASSOCIATES BUILDING 153
1 unitRun by ChargePointOperator website ↗
Questions about HIGH ASSOCIATES BUILDING 153
How fast is the EV charger at HIGH ASSOCIATES BUILDING 153?
HIGH ASSOCIATES BUILDING 153 charges at up to 4kW, which counts as slow charging in the UK.
What connectors does HIGH ASSOCIATES BUILDING 153 have?
HIGH ASSOCIATES BUILDING 153 has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at HIGH ASSOCIATES BUILDING 153?
The charger at HIGH ASSOCIATES BUILDING 153 is run by ChargePoint. The operator's website has account and tariff details.
Can anyone use the charger at HIGH ASSOCIATES BUILDING 153?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Public
- Network
- ChargePoint
- Listed since
- Mar 2023
Contact
- Phone
- 888-758-4389
- Website
- www.chargepoint.com
Within 2 miles