Wattly
Public EV chargerby ChargePoint

INFRASTRUCTURE STATION 1

1426 BC-4

AvailableUp to 4 kW · SlowType 1

Charger types at INFRASTRUCTURE STATION 1

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about INFRASTRUCTURE STATION 1

How fast is the EV charger at INFRASTRUCTURE STATION 1?

INFRASTRUCTURE STATION 1 charges at up to 4kW, which counts as slow charging in the UK.

What connectors does INFRASTRUCTURE STATION 1 have?

INFRASTRUCTURE STATION 1 has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at INFRASTRUCTURE STATION 1?

The charger at INFRASTRUCTURE STATION 1 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at INFRASTRUCTURE STATION 1?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Feb 2023

Contact