Public EV chargerby ZEF Energy
Initiative Foundation
405 1st St SE
Charger types at Initiative Foundation
1 unitRun by ZEF EnergyOperator website ↗
Questions about Initiative Foundation
How fast is the EV charger at Initiative Foundation?
Initiative Foundation charges at up to 4kW, which counts as slow charging in the UK.
What connectors does Initiative Foundation have?
Initiative Foundation has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at Initiative Foundation?
The charger at Initiative Foundation is run by ZEF Energy. The operator's website has account and tariff details.
Can anyone use the charger at Initiative Foundation?
Open to the public, pay at the charger.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Pay at location
- Network
- ZEF Energy
- Listed since
- May 2023
Contact
- Phone
- 888-493-3638
- Website
- www.zefenergy.com
Within 2 miles