Ionity - Corbières Sud
Autoroute des Deux Mers
Charger types at Ionity - Corbières Sud
4 unitsRun by Ionity
About Ionity - Corbières Sud
Located at Corbières Sud on the Autoroute des Deux Mers, Ionity is a popular EV charger location for electric car owners. This charging station is open to the public, but a membership is required in order to use the chargers. Ionity offers three different types of chargers: CCS (Type 2) 350 kWh, CCS (Type 2) 50 kWh, and CHAdeMO 50 kWh.
The CCS (Type 2) 350 kWh charger is the fastest option available at Ionity, providing a high-speed charge for electric vehicles. The CCS (Type 2) 50 kWh charger is a slightly slower option, but still offers a quick charge for those in a hurry. Finally, the CHAdeMO 50 kWh charger is specifically designed for electric vehicles with this type of charging port. With a variety of charging options, Ionity is a convenient and reliable choice for EV owners traveling through Corbières Sud.
Ionity is a modern and well-equipped charging location, offering a convenient and hassle-free experience for electric car owners. The chargers are compatible with a variety of EV models and provide a fast and efficient charge. With its location on the Autoroute des Deux Mers, Ionity is a popular stop for those traveling long distances and in need of a quick charge. Plan your journey accordingly and make use of Ionity's high-speed charging options for a smooth and stress-free EV driving experience.
Questions about Ionity - Corbières Sud
How fast is the EV charger at Ionity - Corbières Sud?
Ionity - Corbières Sud charges at up to 350kW, which counts as ultra-rapid charging in the UK. Its connectors range from 43kW to 350kW.
What connectors does Ionity - Corbières Sud have?
Ionity - Corbières Sud has 17 connectors: 13 × CCS (up to 350kW), 2 × CHAdeMO (50kW) and 2 × Other (43kW).
Who runs the charger at Ionity - Corbières Sud?
The charger at Ionity - Corbières Sud is run by Ionity.
Can anyone use the charger at Ionity - Corbières Sud?
Public, but a membership or subscription is required.
Price and access
- Max power
- 350 kW
- Ultra-rapid
- Connectors
- CCS, CHAdeMO
- 17 in total
- Access
- Members
- Network
- Ionity
- Listed since
- Apr 2023
Within 2 miles