Wattly
Public EV chargerby Stadtwerke Düsseldorf AG

Klimaschutzministerium E-Bike-Ladestation

Schwannstraße 3

AvailableUp to 4 kW · SlowFree

Charger types at Klimaschutzministerium E-Bike-Ladestation

1 unit
OtherCEE 7/4 - Schuko - Type F4kWSlowAvailable2 connectors

Run by Stadtwerke Düsseldorf AGOperator website ↗

About Klimaschutzministerium E-Bike-Ladestation

The Klimaschutzministerium E-Bike-Ladestation is located at Schwannstraße 3. This public charging station is equipped with three different types of chargers: CEE 7/4, Schuko, and Type F. These chargers provide a power output of 4 kWh, making it convenient for E-bike users to charge their vehicles while on the go.

Questions about Klimaschutzministerium E-Bike-Ladestation

How fast is the EV charger at Klimaschutzministerium E-Bike-Ladestation?

Klimaschutzministerium E-Bike-Ladestation charges at up to 4kW, which counts as slow charging in the UK.

How much does it cost to charge at Klimaschutzministerium E-Bike-Ladestation?

Charging at Klimaschutzministerium E-Bike-Ladestation is listed as free. Check on site, as tariffs and parking charges can change.

Who runs the charger at Klimaschutzministerium E-Bike-Ladestation?

The charger at Klimaschutzministerium E-Bike-Ladestation is run by Stadtwerke Düsseldorf AG. The operator's website has account and tariff details.

Can anyone use the charger at Klimaschutzministerium E-Bike-Ladestation?

Open to the public, no membership required.

Price and access

Price
Free
Max power
4 kW
Slow
Access
Public
Network
Stadtwerke Düsseldorf AG
Listed since
Feb 2017

Contact