Klimaschutzministerium E-Bike-Ladestation
Schwannstraße 3
Charger types at Klimaschutzministerium E-Bike-Ladestation
1 unitRun by Stadtwerke Düsseldorf AGOperator website ↗
About Klimaschutzministerium E-Bike-Ladestation
The Klimaschutzministerium E-Bike-Ladestation is located at Schwannstraße 3. This public charging station is equipped with three different types of chargers: CEE 7/4, Schuko, and Type F. These chargers provide a power output of 4 kWh, making it convenient for E-bike users to charge their vehicles while on the go.
This charging station is a part of the Klimaschutzministerium's efforts to promote sustainable transportation and reduce carbon emissions. It is easily accessible for both locals and tourists, making it a convenient stop for those traveling with E-bikes. With its multiple charger options and decent power output, this location is a great option for anyone looking to charge their E-bike in the area.
Whether you're a resident of Schwannstraße 3 or just passing through, the Klimaschutzministerium E-Bike-Ladestation is a reliable and eco-friendly choice for charging your E-bike. The CEE 7/4, Schuko, and Type F chargers provide a variety of options for different types of E-bikes, making it a versatile charging location. So, next time you're in need of a charge, make sure to stop by this public charging station and support the Klimaschutzministerium's efforts towards a greener future.
Questions about Klimaschutzministerium E-Bike-Ladestation
How fast is the EV charger at Klimaschutzministerium E-Bike-Ladestation?
Klimaschutzministerium E-Bike-Ladestation charges at up to 4kW, which counts as slow charging in the UK.
How much does it cost to charge at Klimaschutzministerium E-Bike-Ladestation?
Charging at Klimaschutzministerium E-Bike-Ladestation is listed as free. Check on site, as tariffs and parking charges can change.
Who runs the charger at Klimaschutzministerium E-Bike-Ladestation?
The charger at Klimaschutzministerium E-Bike-Ladestation is run by Stadtwerke Düsseldorf AG. The operator's website has account and tariff details.
Can anyone use the charger at Klimaschutzministerium E-Bike-Ladestation?
Open to the public, no membership required.
Price and access
- Price
- Free
- Max power
- 4 kW
- Slow
- Access
- Public
- Network
- Stadtwerke Düsseldorf AG
- Listed since
- Feb 2017
Contact
- Phone
- 0211/821-8210
- Website
- www.swd-ag.de
Within 2 miles