Wattly
Public EV chargerby ChargePoint

KUM & GO WELLINGTON PL2

8150 6th Street

AvailableUp to 200 kW · Ultra-rapidCHAdeMO, CCS

Charger types at KUM & GO WELLINGTON PL2

2 units
CHAdeMO200kWUltra-rapidAvailable4 connectors
CCSType 1200kWUltra-rapidAvailable4 connectors

Run by ChargePointOperator website ↗

Questions about KUM & GO WELLINGTON PL2

How fast is the EV charger at KUM & GO WELLINGTON PL2?

KUM & GO WELLINGTON PL2 charges at up to 200kW, which counts as ultra-rapid charging in the UK.

What connectors does KUM & GO WELLINGTON PL2 have?

KUM & GO WELLINGTON PL2 has 8 connectors: 4 × CHAdeMO (200kW) and 4 × CCS (200kW).

Who runs the charger at KUM & GO WELLINGTON PL2?

The charger at KUM & GO WELLINGTON PL2 is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at KUM & GO WELLINGTON PL2?

Open to the public, no membership required.

Price and access

Max power
200 kW
Ultra-rapid
Connectors
CHAdeMO, CCS
8 in total
Access
Public
Network
ChargePoint
Listed since
Jul 2023

Contact