Wattly
Public EV chargerby Shell Recharge Solutions (DE)

Ladesäule Ribnitz-Damgarten

An der Mühle 3

AvailableUp to 4 kW · SlowType 2

Charger types at Ladesäule Ribnitz-Damgarten

1 unit
Type 2Socket Only4kWSlowAvailable1 connector

Run by Shell Recharge Solutions (DE)

About Ladesäule Ribnitz-Damgarten

The EV charger location at An der Mühle 3 in Ribnitz-Damgarten is a public charging station that requires a membership to use. The chargers available at this location are Type 2, with sockets only. This means that users will need to bring their own charging cable to connect to their electric vehicle.

Questions about Ladesäule Ribnitz-Damgarten

How fast is the EV charger at Ladesäule Ribnitz-Damgarten?

Ladesäule Ribnitz-Damgarten charges at up to 4kW, which counts as slow charging in the UK.

What connectors does Ladesäule Ribnitz-Damgarten have?

Ladesäule Ribnitz-Damgarten has 1 connector: 1 × Type 2 (4kW).

Who runs the charger at Ladesäule Ribnitz-Damgarten?

The charger at Ladesäule Ribnitz-Damgarten is run by Shell Recharge Solutions (DE).

Can anyone use the charger at Ladesäule Ribnitz-Damgarten?

Public, but a membership or subscription is required.

Price and access

Max power
4 kW
Slow
Connectors
Type 2
1 in total
Access
Members
Network
Shell Recharge Solutions (DE)
Listed since
Jan 2015

Contact