Public EV chargerby ChargePoint
LINK 59 LINK 59 BUILDNG
6007 Euclid Ave
Charger types at LINK 59 LINK 59 BUILDNG
1 unitRun by ChargePointOperator website ↗
Questions about LINK 59 LINK 59 BUILDNG
How fast is the EV charger at LINK 59 LINK 59 BUILDNG?
LINK 59 LINK 59 BUILDNG charges at up to 4kW, which counts as slow charging in the UK.
What connectors does LINK 59 LINK 59 BUILDNG have?
LINK 59 LINK 59 BUILDNG has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at LINK 59 LINK 59 BUILDNG?
The charger at LINK 59 LINK 59 BUILDNG is run by ChargePoint. The operator's website has account and tariff details.
Can anyone use the charger at LINK 59 LINK 59 BUILDNG?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Public
- Network
- ChargePoint
- Listed since
- Feb 2023
Contact
- Phone
- 888-758-4389
- Website
- www.chargepoint.com
Within 2 miles