Mahler Telekommunikation
Am Haldenhang 13
Charger types at Mahler Telekommunikation
2 unitsRun by (Business Owner at Location)Operator website ↗
About Mahler Telekommunikation
Mahler Telekommunikation is a privately owned EV charger location situated at Haldenhang 13. This location requires prior notice for usage of the chargers available. The chargers available at this location include CEE 7/4, Schuko, and Type F with a charging capacity of 4 kWh. Additionally, there is also a Type 2 charger with a socket only option and a charging capacity of 22 kWh.
The CEE 7/4 charger is a commonly used European standard charger, also known as the Schuko plug. It is capable of providing a charging capacity of 4 kWh. The Schuko charger is designed for use with Type F sockets and is commonly used in countries like Germany, Austria, and the Netherlands. The Type 2 charger at this location is only equipped with a socket and not a cable, which allows for more flexibility in terms of charging options. This charger has a higher charging capacity of 22 kWh, making it suitable for faster charging.
If you plan on using the EV chargers at Mahler Telekommunikation, it is important to note that prior notice is required. The chargers available at this location cater to different types of EVs and have varying charging capacities. Whether you have a Type F or Type 2 compatible EV, this location has you covered with its CEE 7/4, Schuko, and Type 2 chargers. With its convenient location and range of charging options, Mahler Telekommunikation is a great choice for EV owners in need of a quick charge.
Questions about Mahler Telekommunikation
How fast is the EV charger at Mahler Telekommunikation?
Mahler Telekommunikation charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 4kW to 22kW.
What connectors does Mahler Telekommunikation have?
Mahler Telekommunikation has 2 connectors: 1 × Type 2 (22kW) and 1 × Other (4kW).
Who runs the charger at Mahler Telekommunikation?
The charger at Mahler Telekommunikation is run by (Business Owner at Location). The operator's website has account and tariff details.
Can anyone use the charger at Mahler Telekommunikation?
Privately owned: notice required before use.
Price and access
- Max power
- 22 kW
- Fast
- Connectors
- Type 2
- 2 in total
- Access
- Restricted
- Network
- (Business Owner at Location)
- Listed since
- Feb 2017
Contact
- Phone
- +491782799829
- Website
- www.molinorc.de
Within 2 miles