Public EV chargerby (Unknown Operator)
Mandeville Village
468 Mandeville Road
Charger types at Mandeville Village
2 unitsRun by (Unknown Operator)Operator website ↗
Questions about Mandeville Village
How fast is the EV charger at Mandeville Village?
Mandeville Village charges at up to 75kW, which counts as rapid charging in the UK. Its connectors range from 63kW to 75kW.
What connectors does Mandeville Village have?
Mandeville Village has 2 connectors: 2 × CCS (up to 75kW).
Who runs the charger at Mandeville Village?
The charger at Mandeville Village is run by (Unknown Operator). The operator's website has account and tariff details.
Can anyone use the charger at Mandeville Village?
Open to the public, no membership required.
Price and access
- Max power
- 75 kW
- Rapid
- Connectors
- CCS
- 2 in total
- Access
- Public
- Network
- (Unknown Operator)
- Listed since
- Oct 2023