Wattly
Public EV chargerby ChargePoint

MOI 479 GOV ST

479 Government St

AvailableUp to 4 kW · SlowType 1

Charger types at MOI 479 GOV ST

1 unit
Type 1J17724kWSlowStatus unknown2 connectors

Run by ChargePointOperator website ↗

Questions about MOI 479 GOV ST

How fast is the EV charger at MOI 479 GOV ST?

MOI 479 GOV ST charges at up to 4kW, which counts as slow charging in the UK.

What connectors does MOI 479 GOV ST have?

MOI 479 GOV ST has 2 connectors: 2 × Type 1 (4kW).

Who runs the charger at MOI 479 GOV ST?

The charger at MOI 479 GOV ST is run by ChargePoint. The operator's website has account and tariff details.

Can anyone use the charger at MOI 479 GOV ST?

Open to the public, no membership required.

Price and access

Max power
4 kW
Slow
Connectors
Type 1
2 in total
Access
Public
Network
ChargePoint
Listed since
Oct 2018

Contact