Wattly
Public EV chargerby (Business Owner at Location)

Mundle Bad und Heizung

Dornierstraße 4

AvailableUp to 22 kW · FastType 2Free

Charger types at Mundle Bad und Heizung

2 units
Type 2Socket Only22kWFastAvailable1 connector
OtherCEE 7/4 - Schuko - Type F4kWSlowAvailable1 connector

Run by (Business Owner at Location)Operator website ↗

About Mundle Bad und Heizung

Mundle Bad und Heizung Dornierstraße 4 is a privately owned EV charger location that requires prior notice before use. This location offers two types of chargers: Type 2 with a socket only and a power output of 22 kWh, and CEE 7/4 - Schuko - Type F with a power output of 4 kWh.

Questions about Mundle Bad und Heizung

How fast is the EV charger at Mundle Bad und Heizung?

Mundle Bad und Heizung charges at up to 22kW, which counts as fast charging in the UK. Its connectors range from 4kW to 22kW.

What connectors does Mundle Bad und Heizung have?

Mundle Bad und Heizung has 2 connectors: 1 × Type 2 (22kW) and 1 × Other (4kW).

How much does it cost to charge at Mundle Bad und Heizung?

Charging at Mundle Bad und Heizung is listed as free. Check on site, as tariffs and parking charges can change.

Who runs the charger at Mundle Bad und Heizung?

The charger at Mundle Bad und Heizung is run by (Business Owner at Location). The operator's website has account and tariff details.

Can anyone use the charger at Mundle Bad und Heizung?

Privately owned: notice required before use.

Price and access

Price
Free
Max power
22 kW
Fast
Connectors
Type 2
2 in total
Access
Restricted
Network
(Business Owner at Location)
Listed since
Sept 2015

Contact