Public EV chargerby ChargePoint
NC STATE DAN ALLEN DR 01
110 Dan Allen Dr
Charger types at NC STATE DAN ALLEN DR 01
1 unitRun by ChargePointOperator website ↗
Questions about NC STATE DAN ALLEN DR 01
How fast is the EV charger at NC STATE DAN ALLEN DR 01?
NC STATE DAN ALLEN DR 01 charges at up to 4kW, which counts as slow charging in the UK.
What connectors does NC STATE DAN ALLEN DR 01 have?
NC STATE DAN ALLEN DR 01 has 2 connectors: 2 × Type 1 (4kW).
Who runs the charger at NC STATE DAN ALLEN DR 01?
The charger at NC STATE DAN ALLEN DR 01 is run by ChargePoint. The operator's website has account and tariff details.
Can anyone use the charger at NC STATE DAN ALLEN DR 01?
Open to the public, no membership required.
Price and access
- Max power
- 4 kW
- Slow
- Connectors
- Type 1
- 2 in total
- Access
- Public
- Network
- ChargePoint
- Listed since
- May 2023
Contact
- Phone
- 888-758-4389
- Website
- www.chargepoint.com
Within 2 miles