Public EV chargerby ChargeNet NZ
Nelson i-SITE Visitor Information Centre
37 Halifax St
Charger types at Nelson i-SITE Visitor Information Centre
3 unitsRun by ChargeNet NZ
Questions about Nelson i-SITE Visitor Information Centre
How fast is the EV charger at Nelson i-SITE Visitor Information Centre?
Nelson i-SITE Visitor Information Centre charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.
What connectors does Nelson i-SITE Visitor Information Centre have?
Nelson i-SITE Visitor Information Centre has 3 connectors: 1 × CHAdeMO (50kW), 1 × CCS (50kW) and 1 × Other (43kW).
How much does it cost to charge at Nelson i-SITE Visitor Information Centre?
The listed price at Nelson i-SITE Visitor Information Centre is 40p per kWh. Note: $. Tariffs can change, so check the charger or the operator's app before you plug in.
Who runs the charger at Nelson i-SITE Visitor Information Centre?
The charger at Nelson i-SITE Visitor Information Centre is run by ChargeNet NZ.
Can anyone use the charger at Nelson i-SITE Visitor Information Centre?
Public, but a membership or subscription is required.
Price and access
- Price
- 40p/kWh
- $
- Max power
- 50 kW
- Rapid
- Connectors
- CHAdeMO, CCS
- 3 in total
- Access
- Members
- Network
- ChargeNet NZ
- Listed since
- May 2017
Within 2 miles