Wattly
Public EV chargerby BP Pulse (UK)

North Row

Central Milton Keynes

AvailableUp to 50 kW · RapidCCS, CHAdeMO79p/kWh

Charger types at North Row

3 units
CCSType 250kWRapidAvailable1 connector
CHAdeMO50kWRapidAvailable1 connector
OtherType 2 (Tethered Connector)43kWRapidAvailable1 connector

Run by BP Pulse (UK)

About North Row

The North Row Central Milton Keynes Public - Membership Required chargers are a convenient and accessible option for electric vehicle owners. Located in the heart of Milton Keynes, these chargers are easily accessible for both residents and visitors. The charging station requires a membership for use, ensuring that only authorized individuals have access to the chargers.

Questions about North Row

How fast is the EV charger at North Row?

North Row charges at up to 50kW, which counts as rapid charging in the UK. Its connectors range from 43kW to 50kW.

What connectors does North Row have?

North Row has 3 connectors: 1 × CCS (50kW), 1 × CHAdeMO (50kW) and 1 × Other (43kW).

How much does it cost to charge at North Row?

The listed price at North Row is 79p per kWh. Note: other tariffs available. Tariffs can change, so check the charger or the operator's app before you plug in.

Who runs the charger at North Row?

The charger at North Row is run by BP Pulse (UK).

Can anyone use the charger at North Row?

Public, but a membership or subscription is required.

Price and access

Price
79p/kWh
other tariffs available
Max power
50 kW
Rapid
Connectors
CCS, CHAdeMO
3 in total
Access
Members
Network
BP Pulse (UK)
Listed since
Sept 2015