Wattly
Public EV chargerby (Unknown Operator)

Obec Desná

Krkonošská 120, Desná II

AvailableUp to 4 kW · Slow

Charger types at Obec Desná

1 unit
OtherCEE 7/54kWSlowStatus unknown1 connector

Run by (Unknown Operator)

Questions about Obec Desná

How fast is the EV charger at Obec Desná?

Obec Desná charges at up to 4kW, which counts as slow charging in the UK.

Who runs the charger at Obec Desná?

The charger at Obec Desná is run by (Unknown Operator).

Price and access

Max power
4 kW
Slow
Network
(Unknown Operator)
Listed since
Sept 2015

Contact